Macarthur

Locality
35km south of Hamilton, Victoria.
Year
2012
Voltage / Function
500/132/33kV Balance of Plant
Asset Owner
AGL/Meridian
Scope

CPP provided design and commissioning services for the following electrical infrastructure:

- Tarrone 500/132kV 600MVA Terminal Substation;

- 12km 132kV Overhead Line;

- Macarthur 132/33kV 560 MVA Collector Substation;

- Collector network to connect 140 3.0MW Vestas Wind Turbine Generators:

- ___km 33kV Cable and Fibre Optic cable;

- ___km 33kV Overhead Line.

CPP also installed 23km of 33kV underground cable and installed the capacitors banks at the Macarthur Substation.