Mokota

Locality
150km North of Adelaide, South Australia
Year
2008
Voltage / Function
275kV Switching Station
Asset Owner
ElectraNet
Scope

Design & Construction of grid connection for Hallett Hill Wind Farm comprising :

  •   275kV Overhead Line Tee-in;
  •   Partially Developed breaker-and-half Arrangement;
  •   3 x 275kV Circuit Breakers;
  •   Control Building and Protection & Control System;
  •   Remote End Protection & Control Upgrades.
  •