Woodlawn Wind Farm

Locality
Bungendore in New South Wales
Year
2010 / 2011
Voltage / Function
180MVA
Asset Owner
Infigen
Scope

Project Management, Design, Procurement, Construction, Test & Commissioning Electrical works for:

  • 330/33kV 180MVA Collector Substation including 33kV AIS switchboard and Reactive Compensation Equipment (1 x 10 MVAr Capacitor Bank & 1 x 5 MVAr Capacitor Bank)
  • 6.5km of 33kV underground power cable and fibre optic cable
  • 10.5 km of 33kV double circuit & 2 km of 33kV single circuit overhead transmission line